OHL-Block-03 Phase-03 Corridor Terrain Mapping and Elevation Profiling
Topographic Survey
Client
UNITED ENGINEERING PROJECT CO LLC
Status
Completed
OVERVIEW
Conducted comprehensive topographic survey covering 27 KM with 5-meter intervals along OHL-Block-03 Phase-03. The scope included detailed terrain mapping, elevation profiling, and precise measurements to support overhead line installation. Essential for infrastructure planning and construction alignment.
Back